- Deschutes & Columbia Center Blvd. Intersection (P2010-23)
Project consists of construction a new traffic signal system to accommodate a new right-turn lane for added turning capacity for west-bound traffic turning northbound onto Columbia Center Blvd. In addition, the proposed work will require the installation of a roundabout at Colorado St. and Deschutes Ave. The proposed work includes the installation of curb, gutter, sidewalk, traffic curbing, concrete traffic islands, retaining walls, driveways, storm drainage, utility trench excavation, landscape and irrigation restoration, HMA patching and overlay, striping, signage and a new signal system. Along Deschutes Ave the entire intersection at Columbia Center Blvd and at Colorado St. will be overlaid with hot mix asphalt and restriped. This proposed work will be in preparation to widen Columbia Center Blvd north of Deschutes Ave, adding a 3rd lane for northbound and southbound through traffic on Columbia Center Blvd to Quinault Ave.
Click here to view Project Plans
Start Date: | Summer 2023 |
Est. End Date: | Fall 2023 |
Funding Source: | Design & right-of-way: Grant through BFCOG & FHWA Construction: Grant through Washington State Transportation Improvement Board (TIB) |
City Project Engineer: Kevin Biersner, P.E., - (509) 585-4524
City Project Inspector: Dan Jacobsen - (509) 727-3690
Contractor: Ellison Earthworks, LLC - Kori Ellison (509) 378-7035
The contractor has started working on the Southwest (Circle K) and Northwest (The Village at Grandridge) corners. The work will involve right lane closures along Columbia Center Blvd. or Deschutes Ave depending on the work. The lane closures will be from 8am to 4pm. The work will consist of demo and grading, installation of new underground utilities in preparation for the new right turn lanes. Concrete pour for sidewalks and curbs is planned for Sept. 25th and 26th, expect only one entrance along Deschutes Ave. to Circle K to be open.