Project Description
This project is for the improvement of the Pedestrian Crossing Safety that consists of installing and/or modifying nine (9) pedestrian crossings at separate identified locations city-wide. This project includes the installation of rectangular rapid flash beacons (RRFB) at each crossing, constructing curb and gutter, extruded curbing, sidewalk, concrete flat work, refuge islands, concrete curb ramps, striping, and signage. There will be some storm drainage catch basin and manhole adjustments and minor landscaping and irrigation repair and restoration, and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
More Info
Start Date: | June 2023 |
Est. End Date: | September 2023 |
Funding Source: | TBD |
Click here to view the updated project flyer! (Jan. 2023)
Project Contacts:
City Project Engineer: Mohammad Jalalyar, P.E., (509)585-4430
City Project Inspector: Steve Rountree, (509)585-4329
Contractor: Ellison Earthworks - Kori Ellison, (509)378-7035
Status
Notice to proceed has been issued and work is expected to begin June 5, 2023
Last updated 5/25/2023