This project will install a storm drain system on 46th Ave and 47th Ave and route it to the Ely St. storm drain system. Currently there are catch basins without any outlets. This will reduce stormwater maintenance costs to both of these streets, reduce flooding potential, and allow our limited stormwater crew to address higher priorities.