Project Description

This project includes the application of bituminous surface treatment (BST) seal coat of approximately 12.67 miles of paved arterial streets within the Kennewick City limits. Work includes, but is not necessarily limited to pavement patching of select areas for BST streets, pre-project sweeping by City crews, traffic control, covering and uncovering of utilities, removal of plastic pavement markings, supply, placement and removal of temporary flexible raised pavement markers, fog seal of pavement patches, BST (Seal Coat) including supply, haul and spreading of 3/8” to #10 crushed aggregate and emulsified asphalt, post project sweeping, sweeping sidewalks as required to remove any debris that results from the project, haul and disposal of picked up excess rock to a contractor provided waste site, application of fog seal, paint striping, and preformed thermoplastic pavement markings.

Important Dates

Start Date:
June, 2019
Estimated End Date:
August, 2019
Location:
12.6 Miles of Residential Streets throughout the city
Estimated Cost:  
$ 570,000

Status:

Start of construction is TBD in late June.

Last updated 5/13/2019