Metaline Avenue Widening                                                                 P-1309

Important Dates

Start Date:    June, 2018

End Date:     November, 2019

Location:      Metaline Avenue                                                                                                                                               

Est. Cost:      $2,000,000

Project Description

This project is for the reconstruction of W. Metaline Avenue from N. Kellogg Street to N. Edison Street. Improvements include adding curb, gutter and sidewalk, reconstructing the asphalt roadway, re-striping, adjusting of new utilities, installing new water and sewer line, utility work, storm system construction, street lighting, signage, pedestrian ramps, traffic control, and other work as required.  Premier Excavation is the contractor selected for this project.

Status

The water main has been installed and water services and the contractor is currently in the process of tying over the water lines.