SR397 & E. Columbia Drive Waterline

columbia_dr_eb_at_wa-397

Important Dates:


Start Date:  March 6, 2017
End Date:   Early May, 2017
Location:    SR397 and Columbia Drive
Cost:          $409,000

Project Description:  

This project consists of the installation of water mains within the City of Kennewick and Washington State Department of Transportation (WSDOT) right of way. Work includes the installation of 8-inch and 12-inch diameter water mains, replacement of existing water service lines and fire hydrants, boring and jacking a 24-inch diameter steel casing, asphalt and gravel restoration, and other miscellaneous items.

Status


The preconstruction conference was held.  Work to begin beginning of March.