Hildebrand / Ridgeline Water System Improvements

Important Dates



Advertise Date:    TBD
End Date:            
Location:             Hldebrand / Ridgeline
Cost:

Project Description


The Hildebrand and Ridgeline Looping project will install approximately 3,100 linear feet of 16-inch water line that will tie the existing Zone 4 parallel water lines  in Ridgeline Drive and Hildebrand Boulevard together by installing water line in Ridgeline near the ASR well and proceed west to Sherman Street,  connecting to the existing Zone 4 water line on Hildebrand Boulevard.


Status