Project Description



The project will improve water and sewer infrastructure at various locations in Kennewick. Existing water and sewer pipe will be replaced with newer pipe beside the older pipe lines still keeping the existing water line or sewer line in service. All the side services from the water line will be replaced to the existing meters at specific sites. There will be scheduled outages in which the public will  be notified.  In some areas the existing water pipe is not adequate for fire flow suppression. The City has proposed to improve the water pipe network by installing a larger pipe to support fire flow in those areas. 


Status